KING TRIP CAMBODIA


Location: Sihanoukville, Cambodia

The total drilling volume of project is around 2800 m.

Charged items by HAICAM:
+ Geotechnical Investigation: Drilling on shore and on sea, Standard penetration test (SPT) for testing soil and rock samples (physico-mechanical properties for soil samples (09 properties) according to ASTM Standard, Unconfined compress test, Undrained Unconsolidated Triaxial test (UU), Consolidated Undrained Triaxial Compressive test (CU), Underground water analysis, Physical-mechanical test on rock (Unconfined Compression test)...
+ Execution time: January 2015

Featured Project

Contact Us

Messenger

Zalo

Telegram

Request a call back (leave your phone number, we'll call you later!)